R172248 | Pentair Rainbow Chlorine Check valve 1/2"
R172248 | Pentair Rainbow Chlorine Check valve 1/2"
SKU#: R172248
Pentair R172248 Rainbow Check valve For Model 320, 322,300-29X Automatic Chemical Feeders
Bromine Standpipe Installation
To increase erosion of small bromine tablets, install Bromine Standpipe as follows:
1. Remove screen from bottom of chamber exposing check valve (F)
2. Insert adapter (T) into check valve opening.
3. Cut supplied 5 /8" black tube (Q) to 6" length and push tube into adapter opening.
-
Product Details
About this product
Description
DIRECTIONS
1. Turn off pump and timer switches.
2. Loosen compression nut and remove Feeder tube and 90° elbow from the diverter tee at base of Feeder.
3. Using teflon tape as thread sealant, wrap 1/2" MPT plug threads (1) with several turns of teflon tape only. Install plug in place of 90° elbow on diverter tee.
4. Disconnect other end of Feeder tube from control valve 90° elbow, by loosening compression nut. Use the compression nuts from old tube to attach new 6' section (2).
5. Push compression nut over tubing end, then push tubing onto tapered end of elbow. Tighten nut firmly by hand.
6. Connect other end of plumbing. IF POOL/SPA HAS A HEATER, INSTALL BETWEEN FILTER AND HEATER. IF
YOUR POOL/SPA HAS A SOLAR SYSTEM, INSTALL BEFORE SOLAR
SYSTEM INLET LINE. IF NO HEATER, INSTALL BETWEEN PUMP AND FILTER. Drill 9/16" hole in plumbing, remove
burrs, and install saddle clamp assembly. (See illustration) Tighten clamp with screwdriver. Slide small stainless steel
clamp #3 over tubing #2 and slide tubing over saddle tube fitting #4. Secure tubing to fitting by tightening camp with
screwdriver. Make sure clamp is below rib at end of saddle tube fitting.
7. To install ½" CHECK VALVE, cut tube approximately 6" away from plumbing connection. Remove compression nuts
from check valve. Slide nuts over both ends of tube. Insert check valve ends into both pieces of tubing and tighten
compression nuts firmly by hand. Be sure arrow “FLOW” is pointing toward the Feeder.Features
Bromine Standpipe Installation
To increase erosion of small bromine tablets, install Bromine Standpipe as follows:
1. Remove screen from bottom of chamber exposing check valve (F)
2. Insert adapter (T) into check valve opening.
3. Cut supplied 5 /8" black tube (Q) to 6" length and push tube into adapter opening.Brand Information
Founded in 1966, Pentair has engineered water solutions to filter, clean and sanitize water to its purest state, while automation equipment makes it all easy to control from anywhere so that you can truly enjoy your pool and spa.
Visit Manufacturers Website -
Q/A
No Questions
Log in
Create a Free Account
Please fill out sign-up form
Sign up with your social media account
Or
Fill out sign up form
Why create an account
Sign up with your social media account